Friday, October 27, 2006

SLIM DEVICES (from Logitech)

Logitech nedávno koupil autora mých oblíbených hraček - firmu Slim Devices. Tento startup je ukázkou možností, které mladým podnikatelům poskytuje Sillicon Valley -- takto o Slim Devices psala Liz Gannes na blogu GigaOM ještě před akvizicí:

...Operated almost entirely in the Valley, Slim Devices is profitable on a sliver of seed funding, and set to do $10 million in sales this year. Led by a 27-year-old CEO, Sean Adams, with little-to-no senior management, the company employs only six engineers, and 20 more employees to take care of assembling the product and answering customer calls. It has open-sourced its software, with outside enthusiasts/developers dreaming up plug-ins that are quickly made into core features.

Myslím, že to nepotřebuje komentáře...

Wednesday, October 25, 2006

Otevřené dveře

Občas si nejsem jistý, jestli mám zavřená dvířka palivové nádrže. Moc by se mi v tu chvíli hodil někdo, kdo by se mi na ně za jízdy podíval...

21. století

Už jako malý kluk jsem se těšil na 21. století. Rok 2000 pro mě bylo něco vzdáleného, doba, kdy budeme bydlet v úplně jiném světě. Představoval jsem si města, ve kterých budou lidé bydlet v různých úrovních a vše bude propojeno výtahy a eskalátory. Moje sny byly jako scény z filmu Blade Runner - jenom bez toho deště...

Ale pak přišel rok 2000 a nic tak velkého se nestalo. A tak až dnes se moje sny částečně naplnily. Poprvé totiž odlétám z nového terminálu 4 na letišti Barajas-Madrid. A je to rozhodně jedna z nejúžasnějších staveb, kterou jsem kdy navštívil. Celková zastavěná plocha je přes 1 000 000 m2, hlavní budovu a satelitní terminál spojuje podzemní vlak a jednotlivá patra spojují výtahy a eskalátory. Přesně tak, jak jsem si přestavoval život v 21. století...



GROSS EXTERNAL FLOOR AREA
Parking, stations, forecourt 335,000m2
Terminal 470,000m2
Satellite 315,000m2

BUDGET
Parking, stations, forecourt 162.273.268 €
Terminal 444.748.957 €
Satellite 276.465.564 €


FOUNDATIONS/SLABS
Typically pad footings, some pilling in satellite over areas of infill.

FRAME, UPPER FLOORS
Concrete frame. Columns on 9 x 18m grid.900mm deep,1,800mm-wide post-tensioned beams of 18m span.
Beams cast in lengths of 72m with 900mm wide x 1,2m long precast concrete planks with 100mm compression layer between. Edge beam casting uses steel shuttering, all the rest use plywood shuttering. Circular columns using steel shuttering except central columns, which support roof and provide horizontal bracing to floors. These columns are paired rectangular capped by inclined ‘horns’ connecting concrete structure to roof steel structure.

ROOF
Steel structure with standard Corus aluminium standing-seam roof covering (with perforated aluminium profiled checking on inside face for acoustic performance). Aluminium roofing panels on double curvature. All joints welded on site.


AIR CONDITIONING
Low-velocity displacement system in pier with 1,7m high 900mm diameter diffusers (totems) at 12m centres and return air ‘totems’ of 13m high, 1,300mm diameter at 36m centres. Finish stainless steel. All other areas high-velocity system with either free-standing nozzles (‘triffids’) in check-in, baggage halls or security and passport screens or located above commercial and office blocks. Nozzles mounted in perimeter trench behind inclined stone curb provide cooled or heated air up façade.

LIFT AND CONVEYOR INSTALLATIONS
Passenger lifts (all in canyons) wall climber with glazed ends. Stainless steel interior panels and painted aluminium external panels. Personnel and goods (non wall-climbers) lifts in fire-rated shafts in cores with stainless steel finish. All escalators and inclined travelators also located in canyons. Standard steel and glass products by Thyssen Krupp.